The Default Tariff You Chose by Doing Nothing: A 45-Day Energy Procurement Reset

Taupo Consulting
The Default Tariff You Chose by Doing Nothing: A 45-Day Energy Procurement Reset

Photo: Jaggery , CC BY-SA 2.0, via Wikimedia Commons

Most UK mid-market boards can name their largest customer, their bank covenant and their three biggest cost lines without reaching for a file. Fewer can say, without checking, when the electricity contract expires, what the volume tolerance band is, or how the broker introducing the deal is paid. That gap is not unusual. It is also not cheap.

This is not an argument for re-tendering on principle. It is an argument for testing, on a fixed timetable, whether the contract in force still matches the business that signed it. Companies change shape: a site closes, a shift pattern moves, a new production line doubles overnight consumption. Supply contracts do not change with them. They run to their own clock, and the clock is usually set by the supplier.

The assumptions buried in a fixed price

A fixed unit rate feels like certainty, and for the energy component it often is. The uncertainty simply relocates. Three clauses repay close reading before any renewal conversation begins.

The commission question nobody asks

Brokers do real work. They navigate supplier credit teams, manage transfer risk and absorb administrative load that most finance functions would rather not carry. The difficulty is that the fee is rarely visible. Commission may take the form of a pence-per-kWh uplift on the supplier rate, a flat fee, or a share of the supplier margin — and only one of those appears cleanly on an invoice.

Boards commissioning a review should ask for disclosure in writing, at the outset, before any letter of authority is signed. The letter of authority itself deserves a look: its scope determines what the broker can commit the company to, and for how long.

Timing is the whole game

Renewal windows commonly open between six and twelve months ahead of contract end, and termination notice periods on rolling contracts can run to 90 days. A contract ending in autumn 2027 may need a decision in spring 2027; a board that starts the conversation in the month before expiry is not procuring, it is accepting.

A practical rule: the renewal date belongs in the corporate calendar next to the audit timetable and the insurance review, with an owner named and a decision date fixed at least two quarters ahead.

The 45-day sprint

The objective is not a new contract. It is a defensible answer to one question: does the current arrangement still fit the business? Forty-five days is enough to find out.

Days Workstream Output
1–7 Gather Current contract and all schedules, letter of authority, 12 months of invoices, half-hourly data if available, site and meter list
8–14 Baseline Consumption profile by site and season, peak kVA, forecast volume for the next 24 months against known operational changes
15–21 Structure Board agreement on risk appetite: proportion fixed, proportion flexible, tenor, tolerance band
22–28 Market test Two brokers and one direct approach, quoting on a like-for-like basis with all pass-through charges itemised
29–38 Negotiate Tolerance band, termination rights, security and credit terms, commission disclosure
39–45 Decide One-page board paper, named owner, renewal diary entry, quarterly consumption review added to the management pack

The most common failure point is day 15. Without an agreed risk appetite, every quote looks either too expensive or too exposed, and the decision drifts past the notice date.

A simple risk matrix for 2026 renewals

Business condition Sensible posture What to watch
Stable volumes, thin margins High fixed proportion, longer tenor Tolerance band must match forecast closely
Volumes falling through efficiency or site closure Lower fixed volume, hybrid structure Avoid take-or-pay; negotiate downward flexibility
Volumes rising or genuinely uncertain Hybrid with generous upside tolerance Check the out-of-contract rate, not just the fixed rate
Cash-constrained, covenant-sensitive Fixed budget certainty, shorter tenor Security deposits and credit support obligations
Multi-site with half-hourly meters Consider separate procurement by site profile Aggregation can mask an expensive site

Questions to put to the broker in writing

  1. What is your commission, expressed per kWh and as a percentage of total contract value, and over what term is it paid?
  2. Which suppliers were approached, on what dates, and what did each return?
  3. What is the volume tolerance band, and what rate applies outside it in each direction?
  4. What is the termination notice period, and does the contract roll over automatically?
  5. Which charges in this quote are fixed and which are pass-through?
  6. What is the cost of early exit, and what security is required?
  7. Who at the supplier owns our account, and what is the escalation route for billing disputes?

What the board should minute

Four things: the named owner of the contract, the renewal decision date, confirmation that commission disclosure is on file, and the tolerance band recorded against the volume forecast. Add a standing quarterly review of consumption against contract assumptions, because the cheapest time to discover a tolerance breach is before the year ends, not after.

Energy is rarely the largest cost line in a mid-market business, but it is one of the few where a single unsigned letter can move the number by six figures. Forty-five days of structured attention is a modest price for removing that exposure.

All Articles

Related Articles

The Clause in the Drawer: A 90-Day Property Exit Audit for UK Mid-Market Boards

The Clause in the Drawer: A 90-Day Property Exit Audit for UK Mid-Market Boards

The Renewal That Renews Itself: A Board Triage for Subscription Contracts

The Renewal That Renews Itself: A Board Triage for Subscription Contracts

The Calendar as a Cost Centre: Auditing the Management Rhythm Before 2027

The Calendar as a Cost Centre: Auditing the Management Rhythm Before 2027